Sunday, November 18, 2007

October Update - Weeks 82-83

We started plumbing in the bath and shower upstairs. We then pressure tested the pipes to 3 bar pressure and no leaks!

Second fix electrics continued (wiring smoke alarms, thermostats, dimmer switches etc).

We started tiling the walls in the bathroom and at the same time Jock and Tim came down for the weekend to install the oak kitchen which looks fantastic (excluding work tops for the moment).