Work continued on the mammoth task of partitioning the barn. The majority of work being upstairs and around the awkward windows and entrances.
The little slit openings that originally were head height downstairs have to fall between the floors due to their length.So we now have a mini windows at floor height in bedroom 3 and in the lounge providing some needed daylight.
By the end of these two weeks all the upstairs rooms were taking shape so we were able to fit all the electric backing boxes for switches and sockets.


0 Comments:
Post a Comment
<< Home