Wednesday, January 16, 2008

January Update - week 92

The double doors in bedroom two were hung and all the door furniture fitted.Quite a complicated job as these doors are designed to fold all the way back allowing maximum light to flood through the bank of velux windows through to downstairs.


Dave had fun making a right mess in the utility room grouting the newly laid tiles.

0 Comments:

Post a Comment

<< Home