As a break from partitioning we started insulating the roof this week. Using Tri-Iso Super 10 (which reduces the thickness of insulation required whilst achieving the same U-value) and another newly acquired power tool- an electric stapling gun we insulated the whole roof space in 3 days.
Another delivery of 50 lengths of 4 by 2 later and we were back to partitioning, this time battoning out the ceilings and roof voids ready for plaster boarding.
We also managed to fit the majority of the internal oak door linings.