July Update - Weeks 64-66
Groan- I'm aching all over, but it is worth it, after a back breaking weekend of putting up the ceilings we can just about say we have finished the plasterboarding!! I think we were both a bit downheartened by the length of time it all took but is very rewarding as the place is transformed into a light airy space. The wires you see are for the spot lights throughout the ground floor.
The plasterer is due on site next week so we have a bit of preparation and protective coverings to get in place before that happens.
While we were stuck indoors missing out on the sunshine, John, the digger man, spent 3 days outside levelling the garden while the weather was fine. We now have a terraced area for lawn and a flat parking area round to the side of the barn- photos to follow next week.